Foundations
Tekst do odsłuchania na www.inzynierbudownictwa.pl
Foundations
– According to what we’ve agreed, we cleaned the excavation floor by removing loose soil, we poured a 10–15 cm thick layer of B-15 lean concrete, we made 40 cm thick formwork for strip footings and 30 x 100 cm formwork for foundation walls.
– What about reinforcement? Was it made in accordance with the design?
– Yes, the cross-sections and the number of bars are correct. The stirrups have been made of ribbed steel. The only change...